
Project Overview
Aureos has been appointed by Nuclear Restoration Services (NRS) to deliver a major phase of decommissioning at Dungeness A nuclear power station in Kent, under a contract worth up to £190m.
As principal contractor, Aureos will lead the removal of eight enormous boiler units, each weighing approximately 800 tonnes, together with associated plant, equipment and structures.
The programme represents a significant milestone in the decommissioning of the former nuclear power station, following four years of enabling works to prepare the site.
Combining specialist demolition, heavy lifting, nuclear engineering and complex programme management, Aureos will deliver an innovative solution to one of the most technically demanding challenges in the UK’s nuclear decommissioning programme.
Sector:
Nuclear
Region:
South East England
Service:
Nuclear decommissioning, complex engineering, demolition and heavy lifting
Client:
Nuclear Restoration Services
Up to £190m
Contract value
Eight
Boilers to be removed
800 tonnes
Approximate weight of each boiler
One-third
Above-ground structures expected to be removed
The challenge
Decommissioning Dungeness A presents a unique combination of engineering, logistical and safety challenges.
The eight boiler units are among the largest structures remaining at the site. Their exceptional size and weight, together with their location within the existing power station structures, make conventional removal methods impractical.
Before the boilers can be extracted, surrounding buildings, plant and sections of the boiler cells must be carefully dismantled to create sufficient space for their removal.
The programme must also be delivered within a highly regulated nuclear environment, with stringent controls governing radiological hazards, asbestos, demolition activities and heavy lifting operations.
Successfully coordinating these activities while maintaining the highest standards of safety requires detailed planning, specialist expertise and close collaboration across the delivery team.
Our solution
Aureos will lead an integrated, multidisciplinary team bringing together specialist expertise in nuclear decommissioning, structural demolition, heavy lifting and temporary works.
The programme will involve the progressive removal of surrounding structures, including the drum house, drum house annex and boiler annexe, alongside plant within the blower hall.
Sections of the concrete boiler cells will be saw-cut and lifted away to create the space required for extraction.
At the heart of the engineering solution is a specialist jack and slide system, designed to move structures of exceptional size and weight in a controlled and precise manner.
This approach will enable the eight boilers to be extracted from their existing cells before being transported to a designated storage area.
Aureos will coordinate specialist delivery partners, including Keltbray, EDF Cyclife, Mammoet, Nxgen and PHD Access, bringing together the capabilities required to undertake this complex programme safely and efficiently.
Detailed engineering, carefully sequenced construction activities and rigorous management of operational interfaces will be central to successful delivery.
Creating long-term value
The project will make a substantial contribution to the long-term decommissioning of Dungeness A.
Once complete, approximately one-third of the site’s above-ground structures will have been removed, significantly reducing its physical footprint and future maintenance requirements.
Beyond the engineering programme, Aureos will work with local schools, universities, businesses and community organisations to create opportunities for engagement, skills development and supply-chain participation.
The project will also provide opportunities for Aureos employees to apply their engineering and construction expertise within the nuclear sector, strengthening specialist capabilities for future infrastructure programmes.
Through innovative engineering, collaborative delivery and a commitment to safety, Aureos aims to support NRS in progressing the decommissioning of Dungeness A while creating lasting value for the client and surrounding community.
